background image

1. DUST COVER

2. SNAP RING

3. LIFT CYLINDER

4. TOP CROSS BAR

5. THREADED SCREW

6. FRAME SLIDER BLOCKS

Figure 6. Snap Ring, Dust Cover, and Frame Slider

Blocks, Remove

NOTE:   

  Access  to  cotter  and  chain  anchor  pins  is

from  behind  sail  weldment,  where  lift  cylinder  is
mounted.

16. 

Disconnect  first  set  of  lift  chains  by  removing
two cotter pins and chain anchor pins from bot-
tom of second intermediate mast weldment. See
Figure 8.

17. 

Remove  two  cotter  pins  and  chain  anchor  pins
from  chain  anchors  mounted  on  sail  cover
bracket.  Remove  first  set  of  lift  chains  from
mast. See Figure 8.

18. 

Using lifting device, lift mast from aerial work
platform  frame.  Grab  frame  slider  blocks  so
that they do not fall out. See Figure 6.

19. 

Lower mast and place in a horizontal position.

DISASSEMBLE

NOTE:  

Remove self-tapping screws with hand tools

and  not  power  tools.  The  use  of  power  tools  can
strip the self-tapping screws and damage them.

1. 

Remove  threaded  end  of  fourth  phasing  cable
from  bracket  on  carriage  weldment.  See  Fig-

ure 5.

NOTE:  

If thread is stripped out of slider block, re-

place with new slider block. See Parts Manual.

2. 

Remove  self-tapping  screws,  setscrews,  and
mast  slider  blocks  from  top  and  bottom  of  car-
riage weldment. See Figure 9.

3. 

Remove  two  cotter  pins  and  two  chain  anchor
pins,  and  disconnect  lift  chains  from  bottom  of
carriage weldment. See Figure 10.

4. 

Remove two pins and four nuts from bottom of
chain  anchors.  Remove  chain  anchors  from

chain  retainer  blocks  and  carriage  weldment.
See Figure 10.

5. 

Remove  two  cotter  pins  and  two  chain  anchor
pins,  and  disconnect  lift  chains  from  chain  re-
tainer  block  at  top  of  carriage  weldment.  See
Figure 10.

6. 

Using  lifting  device,  lift  carriage  weldment  up
and  slide  it  off  of  fourth  intermediate  mast
weldment.

7. 

Remove  nut,  spring,  and  washer  from  third
phasing cables. See Figure 5.

8. 

Remove  third  phasing  cable  from  bracket  on
fourth  intermediate  mast  weldment.  See  Fig-
ure 5.

9. 

Remove  self-tapping  screws,  setscrews,  and
mast  slider  blocks  from  top  and  bottom  of
fourth  intermediate  mast  weldment.  See  Fig-
ure 9.

10. 

Remove  two  cotter  pins  and  two  chain  anchor
pins,  and  disconnect  lift  chains  from  bottom  of
fourth  intermediate  mast  weldment.  See  Fig-
ure 10.

11. 

Remove two pins and four nuts from bottom of
chain  anchors.  Remove  chain  anchors  from
chain  retainer  blocks  on  fourth  intermediate
mast weldment.

Mast Repair

4000 SRM 1916

8

Summary of Contents for A254

Page 1: ...Hyster A254 AP20Z Forklift...

Page 2: ...MAST REPAIR S N A615 AP20Z A254 PART NO 4131893 4000 SRM 1916...

Page 3: ...tenance or repair on aerial work platforms Always use correct blocks to prevent the unit from rolling or falling See HOW TO PUT THE LIFT ON BLOCKS in the Operating Manual for your lift Keep the unit c...

Page 4: ...On the lift the DANGER symbol and word are on red background The WARNING symbol and word are on orange background The CAUTION symbol and word are on yellow background...

Page 5: ...ore information Please click here Then get the complete manual NOTE If there is no response to click on the link above please download the PDF document first and then click on it Have any questions pl...

Page 6: ......

Page 7: ...Precautions 2 Discharging the Capacitors 2 Description 4 Mast Repair 6 Remove 6 Disassemble 8 Clean and Inspect 15 Assemble 15 Install 20 Mast Adjustments 21 Lateral Mast Adjustment 21 Vertical Mast A...

Page 8: ...THE QUALITY KEEPERS HYSTER APPROVED PARTS...

Page 9: ...th serial number A615 used on the aerial work platform covered in this manual Procedures to repair the carriage and adjust the lift chains carriage and mast are also covered in this manual Additional...

Page 10: ...er repairs and adjustments can create dangerous operating conditions DO NOT operate an aerial work platform that needs repairs Report the need for repairs to your supervisor immedi ately If repair is...

Page 11: ...are off the floor to prevent aerial work platform from moving 4 Remove the electrical compartment cover to ac cess the combination and traction controller See the Frame manual listed in the General se...

Page 12: ...dment second inter mediate mast weldment third intermediate mast weldment fourth intermediate mast weldment and a carriage weldment fifth intermediate mast weld ment See Figure 4 One main lift cylinde...

Page 13: ...DIATE MAST WELDMENT 2 SECOND INTERMEDIATE MAST WELDMENT 3 THIRD INTERMEDIATE MAST WELDMENT 4 FOURTH INTERMEDIATE MAST WELDMENT 5 CARRIAGE WELDMENT 6 LIFT CYLINDER Figure 4 Mast Weldments 4000 SRM 1916...

Page 14: ...urn off all power to aerial work platform by disconnecting the battery and discharging the capacitors See the Special Precautions section for procedures to discharge the capacitors 9 Zip tie lift cyli...

Page 15: ...CABLE 6 THIRD PHASE CABLE 7 FOURTH PHASE CABLE 8 BRACKET 9 FIRST INTERMEDIATE MAST WELDMENT 10 SECOND INTERMEDIATE MAST WELDMENT 11 THIRD INTERMEDIATE MAST WELDMENT 12 FOURTH INTERMEDIATE MAST WELDMEN...

Page 16: ...k See Parts Manual 2 Remove self tapping screws setscrews and mast slider blocks from top and bottom of car riage weldment See Figure 9 3 Remove two cotter pins and two chain anchor pins and disconnec...

Page 17: ...PANEL 4 MAST SIGNAL CABLE 5 SPRING 6 BRACKET 7 CAPSCREWS 8 WIRE HARNESS CABLE 9 ROUND BELT PULLEY 10 HYDRAULIC TUBE CONNECTION EXCESS FLOW PROTECTOR 11 HYDRAULIC TANK Figure 7 Mast Tensioning System...

Page 18: ...B BOTTOM OF MAST 1 CHAIN ANCHOR 2 CHAIN ANCHOR PIN 3 COTTER PIN 4 LIFT CYLINDER 5 CHAIN RETAINER BLOCK 6 LIFT CHAIN 7 SAIL COVER BRACKET Figure 8 Disconnecting First Set of Lift Chains Mast Repair 400...

Page 19: ...A OUTSIDE VIEW B INSIDE VIEW 1 MAST SLIDER BLOCKS 2 SETSCREWS 3 SELF TAPPING SCREWS Figure 9 Mast Slider Blocks Removal 4000 SRM 1916 Mast Repair 11...

Page 20: ...MUST FACE OUTBOARD SIDE OF MAST DURING INSTALLATION AS SHOWN ABOVE A BOTTOM VIEW OF MAST B TOP VIEW OF MAST 1 COTTER PIN 2 CHAIN ANCHOR PIN 3 LIFT CHAIN 4 CHAIN ANCHOR 5 PIN 6 CHAIN RETAINER BLOCK 7...

Page 21: ...third intermediate mast weldment See Figure 11 24 Using lifting device lift third intermediate mast weldment up and slide it off of second in termediate mast weldment 25 Remove self tapping screws se...

Page 22: ...AIN SHEAVES AND CABLE PULLEYS ON ALL OTHER INTERMEDIATE MAST WELDMENTS ARE SIMI LAR A TOP OF MAST B BOTTOM OF MAST 1 SNAP RING 2 WASHER 3 CABLE PULLEY 4 CHAIN SHEAVE ASSEMBLY SHEAVE SNAP RING AND BEAR...

Page 23: ...elf tapping screws with hand tools and not power tools The use of power tools can strip the self tapping screws and damage them 1 If lift cylinder was removed see the Lift Cylin der Repair manual list...

Page 24: ...se the mast weldments so that the sec ond intermediate mast weldment is flush with the first intermediate mast weldment NOTE Do not adjust setscrews at this moment Start the thread and do not apply pr...

Page 25: ...llation chain anchor pins must face outboard side of mast See Figure 10 22 Install free end of lift chain no chain anchor at tached to chain retainer blocks at top of first intermediate mast weldment...

Page 26: ...mediate mast weldment using snap rings See Figure 11 38 Install two lift chains with a length of 1924 05 mm 75 3 4 in to two chain anchors with two chain anchor pins and two cotter pins See Figure 10...

Page 27: ...oximately 68 kg 150 lb 53 Using a lifting device lift carriage weldment and slide it through mast slider blocks on top of fourth intermediate mast weldment to the posi tion shown in Figure 15 This pro...

Reviews: