Install and Set Up the Plasma Power Supply
2
46
810470
Operator Manual
Powermax65/85/105 SYNC
Figure 3
– Install a power cord
For more instructions, refer to one of the following Field Service Bulletins:
Powermax65/85 SYNC Power Cord and Strain Relief Replacement
(807020)
Powermax105 SYNC Power Cord and Strain Relief Replacement
(810420)
L1
L2
L3
CSA power cord
(no ferrite cores)
CE/CCC power cord
(ferrite cores on power wires and
ground wire)
419 mm (16.5 inches)
M5 / #10 terminal ring,
approximately 12 mm
(0.5 inch) long
65/85
102 mm
(4 inches)
105
152 mm
(6 inches)
L1
L2
L3
Ground
Strain relief
Summary of Contents for SYNC Powermax 105
Page 1: ...Powermax65 85 105 SYNC Operator Manual 810470 REVISION 3 ENGLISH ...
Page 8: ......
Page 14: ...Contents 14 810470 Operator Manual Powermax65 85 105 SYNC ...
Page 20: ...Where to Find Information 1 20 810470 Operator Manual Powermax65 85 105 SYNC ...
Page 62: ...Install and Set Up the Plasma Power Supply 2 62 810470 Operator Manual Powermax65 85 105 SYNC ...
Page 94: ...Operate the Plasma System 3 94 810470 Operator Manual Powermax65 85 105 SYNC ...