OPERATION:
Startup Check List
ü
Check that all air tubing is connected to the injectors and any associated
manifolds
ü
Check for pinched air injector lines
ü
Check for leaks, always
ü
Check power cord is connected to control
ü
Make sure the blower circuit voltage matches the blower voltage.
1. Fill the spa or bath with water. Check for leaks
2. Connect the blower to the power source, either a spa controller or other
device.
3. Do not connect blower to tub plumbing
4. Activate the blower using the corresponding button on the control
5. Take an AMP reading with an AMP probe and make a note of this
reading.
6. Turn off blower
7. Connect the blower to the plumbing with the hose clamp provided
8. Activate the blower using the corresponding button on the control
10. With blower running take a reading with an AMP Probe. The total AMP
draw should not drop by more than ½ AMP
If the AMP draw drops by more than ½ AMP then the blower installed may
be too large for the application.
**Operation of the blower should be limited to 20 minute cycles.
Failure to follow this instruction will shorten the motor life**
Startup: