8
6
The FlowHD must be connected with 3M™ DBR/Y-6 wire splicers. Follow manufacturer’s instructions
when using the 3M™ DBR/Y-6 Wire Splicers.
Best practices include:
Stripping insulation 3/4” from the connecting end
Ensuring the connector is inserted all the way into the tube until the connector rests on the bottom
of the tube
Ensuring there is no water intrusion into the connector
Tightening connections until secure
NOTE: If having difficulty getting the twist-on connector down into the tube when using small gauge
wires, use a thin, non-conductive object to push the connector to the bottom of the tube. Upon
removal of the object, ensure that no voids or water paths remain in the gel.
Wiring Connections for the FlowHD
1. Connect the wires from the FlowHD Device to the field wires, using the diagram below as a guide.
Part 3: Wiring Connections
Summary of Contents for WeathrerTRAK FlowHD
Page 18: ...17 Notes ...
Page 19: ...18 Notes ...
Page 20: ...19 www hydropoint com support hydropoint com Rev2019510 ...