
HYDROLOGICAL SERVICES PTY LTD
_______________________________________________________________________________________
Cut the tube at the coil end (tape both ends), ensuring that there is sufficient length to make the
joint at the HS55 within the shelter.
Check the lay of the tubing in the trench to ensure that it is free of coils and kinks. Under no
circumstances should the tube form hollows where moisture can be trapped within the tube.
Lay the tubing into position in the equipment shelter as required.
Remove the protective tape from the end of river line tube.
Insert the end of the tube into the appropriate river line fitting on the HS55 and tighten both
fittings. (Refer to diagram for tightening procedure).
Open the valve to the orifice.
Gas Purge Compressor
Issue 7:
16/12/03
© Copyright
HS55 110-03