Hydraram HDG-110R Operating And Maintenance Manual Download Page 5

5

 

Warning 

Never work on the hydraulic system if the system is still under pressure! Keep hands 

away from moving parts at all times. 

Hydraram

 cannot anticipate every possible circumstance that might involve a potential 

hazard. The warnings in this publication are, therefore, not all–inclusive. If a tool, 

procedure, work method or operating technique that is not specifically recommended by 

Hydraram

 is used, then you must assure yourself that it is safe for you and others. 

You should also ensure that the product will not be damaged or made unsafe by the 

operation, lubrication, maintenance or repair procedures that you choose. 

Safety Regulations 

The 

demolition

 Grab should always be attached to an excavator of the correct weight, 

class and capacity of machine. Refer to the data information plate on the grab and 

consult the technical specifications in this manual. When in doubt contact the supplier. 

The weight of the grab, increased by the weight of the load being picked up, must never 

exceed the maximum allowance of lifting power. For further information consult the 

excavator manual. 

It is prohibited for people to be within the rotation range of the machine and grab. Keep in 

mind that material being lifted that extrude from the grab will enlarge the rotation range.  

It is always  possible that material can fall out of the excavator’s grab. For this reason, 

never rotate the machinery above people, machines nor vehicles. 

Always pick up a long load at its centre of gravity, to prevent the excavator from either 

rotating or tipping over. It is not permissible to use the grab to hit or pound. 

Whilst connecting or disconnecting, lubricating or other maintenance work, the grab must 

be stable and on a flat surface. Before performing lubricating or other maintenance work 

the engine should always be  shut down. 

Summary of Contents for HDG-110R

Page 1: ...1 CE Operating and Maintenance Manual HDG 110R Demolition and Sorting Grab...

Page 2: ...piece of equipment for excavators The demolition grab is available in various weights capacities and versions and is always a fast and purpose built demolition device It is imperative you read this m...

Page 3: ...pliance 4 Safety regulations 5 Conditions of guarantee 6 Operation 7 Daily maintenance 8 Lubrication schedule 9 Exploded view Total 10 Part list Total 1 11 Part list Total 2 12 Partslist exploded view...

Page 4: ...ould draw your attention to the fact that the demolition grab product is designed to be assembled with another machine and that the product on the grounds of the machine Guide Line can only be used on...

Page 5: ...rab and consult the technical specifications in this manual When in doubt contact the supplier The weight of the grab increased by the weight of the load being picked up must never exceed the maximum...

Page 6: ...carried out in consultation with the dealer the necessary parts which fall under the warrantee will be delivered without charge For larger repairs the grab should be sent to your dealer or Hydraram f...

Page 7: ...nd only briefly maximum of 10 of the working time at 100 bar The oil flow and pressure of the pinching opening and closing of the sorting grab needs to be controlled and adjusted Check if the hydrauli...

Page 8: ...onnected Before disconnecting ensure there is no pressure on the hoses Consult the manual for the excavator The grab must be lubricated once every 8 operating hours with the same lubricant recommended...

Page 9: ...e Picture 3 Lubricating pivoting points 1 Lubricate 1 x per 8 operating hours Picture 5 Lubricating rotator 1 Lubricate 1 x per 8 operating hours Picture 4 Lubricating pivoting points 1 Lubricate 1 x...

Page 10: ...10 Exploded View HDG 110R TOTAL...

Page 11: ...D 011 12 2 Disk spring S803D 012 13 2 Castellated nut M42 S803D 013 14 2 Spline pin 8mm x 60 secure on M42 S803D 014 15 2 Spline pin16mm S803D 015 16 1 Locker plate Linkage axis top long 50mm S803D 01...

Page 12: ...in connect block rotation function 1 2 G S803D 038 39 2 Main connect nipple rotation function S803D 039 42 1 set Seal kit hydro motor for 1 motor S803D 042 43 1 set Bolt set hydro motor for 2 motors S...

Page 13: ...onnection 2 ports S803D 101 102 1 Piston rod S803D 102 103 1 Cylinder nut S803D 103 104 1 Piston S803D 104 105 2 Bearing cylinder housing S803D 105 106 1 Bearing cylinder nut S803D 106 107 1 set Cylin...

Page 14: ...nut S803D 103 104 1 Piston S803D 104 105 2 Bearing cylinder housing S803D 105 106 1 Bearing cylinder nut S803D 106 107 1 set Cylinder seal kit S803D 107 108 1 Secure bolt M8 x12 S803D 108 109 1 Secure...

Page 15: ...D 202 203 1 C O D cover S803D 203 204 1 C O D connection block S803D 204 205 1 Bearing S803D 205 206 1 Seeger circlip ring S803D 206 207 1 set Bolt set C O D connection block 2 pcs S803D 207 208 1 set...

Page 16: ...r pitch and metric size and maximum torque specified prior to fastening Bolt size Torque Nm Torque Kg m Bolt 10 9 Bolt 10 9 M8 40 Nm 4 Kgm M10 80 Nm 8 Kgm M12 130 Nm 13 Kgm M12x1 25 110 Nm 11 Kgm Note...

Reviews: