3
10/05
P/N 211446
07
HR83002.EPS
211560
HR83002.EPS
211560
HR83001.EPS
2111560
24" (61 cm)
36" (91.4 cm)
XG02.EPS
Ensure ground is level with playing
surface, then dig pole hole.
GROUND
SURFACE
PLAYING
SURFACE
1.
Install threaded ends of J-bolts (1) through holes in
mounting plate (3) and secure as shown.
NOTE: Make sure J-bolts (1) are in the illustrated
position.
NOTE: Nuts on the top of plate are used for leveling
the pole after system is fully assembled.
2.
3
2
2
2
1
3.
1
CONTACT UTILITIES
BEFORE DIGGING.
Install nut (2) to J-bolt (1)
as shown. Repeat
procedure for other three
J-bolts (1).
WARNNG.EPS
WARNING
AVERTISSEMENT
ADVERTENCIA
AVVERTENZA
ATENÇÃO
ADVARSEL
ADVARSEL
WAARSCHUWING
VARNING
!WARNUNG
2”
(5.08 cm)
IMPORTANT!
Make sure nuts are 2”
(5.08 cm) from top of J-Bolts.