![Hydac CTM-EF-1 Series Operating And Maintenance Instructions Manual Download Page 19](http://html.mh-extra.com/html/hydac/ctm-ef-1-series/ctm-ef-1-series_operating-and-maintenance-instructions-manual_2191298019.webp)
Checking the scope of delivery
CTM-EF 1x3x Series
en
Page 19 / 52
BeWa CTM-EF 1x3x 4365310 en-us 2018-06-06.docx
2018-06-06
Checking the scope of delivery
The ContaminationTest Module CTM-EF comes packed and ready to be
connected. Before commissioning, please check the scope of delivery to
make sure it has not been damaged during transport and that it is complete.
Qty
Designation
1
ContaminationTest Module CTM-EF
1
Technical documentation, consisting of:
- Operating and maintenance instructions (this document)
- Circuit diagram
- Additional documents
- Certificates