Preparation and test drive
1
、
The machine must be cleared after assembling.
2
、
Avoid any loosing at the joint part of nut and screw. Make sure there is no
barriers at the parts for transferring.
3
、
Every electric unit must not be loose. Then supply the power and make
electric wire earthing so that check whether the direction of rotation is right.
Because this machine is fully guard, so you must disassemble front-guard
and make sure whether the direction is consistent with picture 5 after have
knowledge for motor direction.
4
、
Check whether oil can through oil-way freely according to lubricate picture.
And add lubricant to every part.
5
、
Check whether upper and bottom blade’s edge date is same as the shearing
thickness.
6
、
Test the machine according electric Manual.
The second
concrete
pouring
The first
concrete
pouring
Summary of Contents for HU 1300 X 4 ES
Page 1: ...E L E C T R I C S H E A R I N G M A C H I N E HU 1300 X 4 ES...
Page 10: ...9...
Page 11: ...10...
Page 12: ...11...
Page 22: ...21 ELECTRICAL DRAWINGS...
Page 23: ......
Page 28: ...115 114 103 102 111 110 109 108 107 106 105...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ...2017 V1 Copyright Huberts BV All rights reserved...