11 SERVICE WORK ON THE CHASSIS
46
11.8
Installing the fork protector
F00047-11
–
Position the fork protector on the left fork leg. Mount and tighten screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
–
Position the brake line and clamp. Mount and tighten screws
.
–
Position the fork protector on the right fork leg. Mount and tighten screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
11.9
Removing the lower triple clamp
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the start number plate. (
–
Remove the front fender. (
–
Remove the handlebar cushion.
F00236-10
Main work
–
Take off cable holder
in front of the left radiator.
–
Remove screw
.
–
Remove screw
.
–
Take off the upper triple clamp with the handlebar and set it aside.
Info
Protect the components against damage by covering them.
Do not bend the cables and lines.
H01528-10
–
Remove O-ring
. Remove protective ring
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.