11 SERVICE WORK ON THE CHASSIS
50
11.9
Removing the lower triple clamp
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the start number plate. (
–
Remove front fender. (
–
Remove the handlebar cushion.
K01249-10
Main work
–
Take off cable holder
1
in front of the left radiator.
–
Remove screw
2
.
–
Remove screw
3
.
–
Remove the upper triple clamp with the handlebar and hang
them to the side.
Info
Cover the components to protect them against dam-
age.
Do not kink the cables and lines.
K01250-10
–
Remove O-ring
4
. Remove protective ring
5
.
–
Remove the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
Summary of Contents for F2101V0
Page 1: ...OWNER S MANUAL 2022 TC 125 Art no 3402529en ...
Page 2: ......