![Husqvarna 2009-01 Operator And Parts Manual Download Page 9](http://html.mh-extra.com/html/husqvarna/2009-01/2009-01_operator-and-parts-manual_170499009.webp)
10
Install the bagger mount tube to the rear guard
1.
with
5
/
16
-18 x 3¼ bolts and flange nuts from kit.
NOTE: Depending on model, rear guard hole may
need to be drilled out to
5
/
16
" if kit hardware is too
large.
Install kit support straps on the outside of the
2.
mount tube as shown in the illustration. Using a
5
/
16
-18 x 1¼ bolt, attach the front side of the strap
to the fender support. Do not add flange nut at this
time. Place the reinforcement plate to the outside
of the fender support. Secure with additional 1¼
bolt and fasten both bolts with flange nuts. Repeat
steps on opposite side.
NOTE: The front side of the kit support straps
should be on the inside of the mower frame.
Tighten all hardware.
3.
ASSEMBLY
7
INSTALLING BAGGER MOUNT
Reinforcement Plate
Mount Tube
Support Strap
Drill rear
guard hole to
5
/
16
" if needed
Rear Guard
5
INSTALLING BELT COVERS
1. Place the deck belt shield on the deck over the
drive pulley and secure with hardware removed
from steel belt shield.
2. Place retainer on the outer pulley cover.
3. Align the tab end of the belt cover into the slot on
the deck belt shield and the other end over the end
of the outer pulley cover.
4. Secure with knob.
Retainer
Knob
Outer Pulley Cover
Deck Belt Shield
Belt Cover Tab
Middle Chute Latch
6
INSTALLING MIDDLE CHUTE
1. Place middle chute over the top end of the blower
assembly.
2. Latch middle chute to blower assembly.
Middle Chute
Blower Assembly
Summary of Contents for 2009-01
Page 1: ...Blower Kit 61 Collection System 966004801 Operator and Parts Manual ...
Page 15: ...16 6 5 4 4 3 3 1 9 2 12 10 7 8 11 REPAIR PARTS ...
Page 17: ...18 1 2 4 6 7 8 9 10 11 7 5 12 12 3 3 REPAIR PARTS ...
Page 19: ...20 REPAIR PARTS 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 6 18 11 18 18 ...
Page 23: ...P N 115 145327 R01 05 09 09 ...