  1. Locate the most visible location to install control panel.

  2.  Securely (not permanently) mount control panel to wall.

  3.  Assemble gauge (do not install to tank).

  4.  Loosen thumbscrews on sensor.

  5. Slide sensor to desired depth (high or low).

  6.  Connect an ohmmeter to sensor leads.

  7.  Slowly move float arm up and down to assure circuit is broken at desired level.

  8.  Once proper setting is achieved, lock sensor in place using thumbscrews - tighten firmly, 

approximately 1 to 2 turns past hand tight, but do not overtighten.

  9.  Remove glass jar and linkage assembly from bung adaptor - do not disturb sensor setting.

10.  Use appropriate sealant on male threads of bung adaptor.

11.  Screw bung adaptor into tank bung opening - tighten firmly, approximately 1 or 2 turns past hand 

tight, but do not overtighten.

12.  Install linkage assembly into bung adaptor. Float arm must travel freely and not contact any 

baffles or the sides of the tank (use groove on top assembly as a guide).

13.  Reinstall glass jar - tighten firmly, approximately 1 or 2 turns past hand tight, but do not 

overtighten.

14.  Solder (or wire nut) sensor leads then tape the connections.

15.  Seal hole with silicone or appropriate sealant.

16.  Connect wire to printed circuit board terminals marked "N/C SENSOR IN".

17.  Select a non-switched 24-hour hot 115v outlet, preferably dedicated solely for use with the 007.

18.  Connect transformer wires to printed circuit board terminal marked "12VDC POWER IN" .

19. Secure transformer to outlet using outlet plate screw.

20. Test control panel to confirm audible siren sounds and strobe light flashes.

DO NOT PLUG IN THE TRANSFORMER PRIOR TO CONNECTING WIRES TO CONTROL PANEL. 

ONLY USE HUSKY

®

 BRAND TRANSFORMER WITH 007 TANK MONITORS.

TESTING / MAINTENANCE / INSPECTION

007 JAR

-

HEAD

WARNING   

Never use with gasoline or highly flammable liquids.

Husky Corporation • 2325 Husky Way • Pacific, MO 63069 • Phone: (800) 325-3558 • Fax: (636) 825-7300 • www.husky.com 

Page 1                                                                            009310-7 7/2019

INSTALLATION INSTRUCTIONS

Daily

•  Confirm the AC power indicator is lit.

•  Confirm Siren toggle switch is in the "ON" 

position.

•  Confirm audible siren sounds.

• Confirm strobe light flashes.

Quarterly

•  Remove sensor from tank and manually 

raise / lower float to verify system goes 

into alarm mode.

•  Manually test all accessories for proper 

function.

•  Confirm all wires are properly connected 

to control panel and accessories.

•  Follow all city, state, or federal wiring code 

requirements as appropriate.

•  Apply city, state, or federal testing regulations 

as appropriate.

ANY TEST / INSPECTION FAILURE 

REQUIRES IMMEDIATE EQUIPMENT 

REPLACEMENT OR REMOVAL FROM 

SERVICE.

MADE IN THE USA

007 Tank Monitor with Jarhead Tank Gauge

007555, 008666 & 009919

Recommended Installation, Maintenance 

and Inspection Instructions

Important safety instructions - save these instructions in a readily accessible location.