9
UNDERWATER OPERATION
Operation of hydraulic hammers under water requires proper preparation to prevent
internal damage to hammer parts and carrier hydraulic system.
1. To prepare the hammer for underwater operation you will need
an external compressed air supply.
2. Connect air supply line to front cap threaded port (remove plug
P/N 3Z01-FP0038 as shown.) Thread is 3/8-inch pipe tapered.
3. Set pressure regulator to 50 – 90 psi.
4. Maintain air supply to hammer at all times when operating
under water
5. For HH1500 through HH8000, 20 to 50 CFM is required.
PRESSURE REGULATOR
Figure 3. Air Compressor Supply
Summary of Contents for HH1500
Page 1: ...1 HUSKIE HYDRAULIC HAMMERS SERVICE MANUAL HH1500 HH2000 HH3600 HH4500 HH5800 HH8000...
Page 33: ...33 9 PARTS LIST AND ILLUSTRATIONS HH1500 HH2000 HH3600 HH4500 HH5800 HH8000...
Page 35: ...35 Effective 07 05 HH1500 HAMMER...
Page 37: ...37...
Page 39: ...39 HH2000 HAMMER UP TO S N 2K031 SOLD BEFORE 9 96 Effective 07 05...
Page 41: ...41 Effective 07 05 HH2000 HAMMER S N 3K001 UP SOLD AFTER 10 96...
Page 43: ...43...
Page 45: ...45 HH 3600 2 HAMMER S N 5M1000 UP Effective 07 05...
Page 47: ...47...
Page 49: ...49 HH4500 HAMMER Effective 07 05...
Page 51: ...51...
Page 53: ...53 HH5800 HAMMER Effective 07 05...
Page 55: ...55...
Page 57: ...57 HH8000 HAMMER Effective 07 05...
Page 59: ...59 NOTES...