background image

4

4

PANEL ASSEMBLY U-CHANNEL

STEP 1

Put U-channels on post sides between top and bottom rail cutouts.  

You can secure these with the 3/4” screws provided.  Repeat this 

step until all u-channels are installed.

5

PANEL ASSEMBLY PICKETS

STEP 1

Starting on one end, insert the first picket into the bottom rail and the u-channel.  Proceeding down the panel, insert 

the pickets into the bottom rails and interlock tongue and grooves as you go.  If the posts are set at less than 93-1/2” 

on center you will need to cut down a tongue and groove picket to a smaller width to fit your remaining opening.  

These can be cut down with a power saw also.  The cut will be hidden and insert into the end u-channel.

6

PANEL ASSEMBLY TOP RAILS

STEP 1

Place one end of the top rail into the posts and work your way 

down the panel, inserting pickets into the top rail as you go.  

Once all of the pickets are installed, slide the loose end of rail 

into the posts.  If posts spacing is less than 93-1/2” on center cut 

a piece of top rail to achieve desired length.  You can purchase 

a notching tool to re-notch the rails or in most cases you can put 

a screw into the cut rail to hold the rail in place.  Repeat these 

steps until all pickets and top rails have been assembled.

  HUSKER VINYL 

W

oodland

 S

elect

 P

rivacy

 P

anel

 & G

ate

Installation  Instructions  

Reviews: