8
Floor
Clearance
Top Of
Bracket
Ordered
Shade
Height
5
/
8
"
Minimum
Bracket Spacing
Measure and mark where to attach the installation brackets. Place installation
brackets 8" in from the ends of the shade.
Space additional brackets evenly between the two end brackets.
Bracket Placement
Place the top of the mounting bracket a minimum
of
5
/
8
" from the top of the window opening.
NOTE:
When mounting to drywall, you must use a
wall anchor.
To locate where to place the top of the
bracket, take the ordered shade height
and add to it the desired
floor clearance.
The shade height can be found on
the packaging label. If no label exists,
contact your dealer.
Use a level to ensure that the brackets
are level and aligned.
■
■
■
■
■
OUTSIDE MOUNT — BRACKET INSTALLATION
Space Evenly
Space Evenly
8"
8"
Installation Brackets
Summary of Contents for Vertiglide Applause Honeycomb
Page 1: ...Duette and Applause Honeycomb Shades Vertiglide Shades Installation and Care Instructions...
Page 19: ...19 INSIDE AND CEILING MOUNT INSTALLATION...
Page 32: ...32...
Page 33: ...33 TRADITIONAL ON THE FLOOR INSIDE AND OUTSIDE MOUNT INSTALLATION...
Page 42: ...42...
Page 43: ...43 FINAL ADJUSTMENTS...