background image

INSTALLATION

4

 

 Test fit the left pre-drilled mounting channel into the window opening.

 

If the gap is greater than 

1

16

", select the proper  combination of top and bottom end 

caps to minimize the gap.

NOTE:  

D-seal on the top of the top end caps can be effective in reducing light gaps.

 

Attach the end caps as shown and test to ensure a snug fit.

 

Repeat for the right side.

Gap

Street

Pre-drilled 

holes

Room

Top Left

Bottom Left

Pre-drilled 

holes are 

6in apart

Summary of Contents for Duette Honeycomb Shades

Page 1: ...Installation Care Duette Honeycomb Shades LightLock System for LiteRise and PowerView Automation Operating Systems...

Page 2: ...ck Parts 1 Tools and Fasteners Needed 2 INSTALLATION Install the Channels 3 Install the Brackets 7 Apply D seal If Necessary 7 Install the Shade 8 Test the Shade 8 Finish the Installation 8 CARE Remov...

Page 3: ...e owners Flush Mount Depth 33 4 PowerView Headrail mounted rechargeable battery wand Flush Mount Depth 3 PowerView Battery wand high and low mount Trim the template at this dotted line for PowerView H...

Page 4: ...Head Screws Provided 11 2 screw is provided per installation bracket Also 11 2 screws are provided for the mounting channels the number of the screws provided depends on the length of the channels Mo...

Page 5: ...is 11 4 Place the template at the bottom of the left side jamb and mark the rear edge of the template on the jamb This mark represents the rear edge of the mounting channel Repeat this step for the t...

Page 6: ...the proper combination of top and bottom end caps to minimize the gap NOTE D seal on the top of the top end caps can be effective in reducing light gaps Attach the end caps as shown and test to ensure...

Page 7: ...led holes using the screws provided NOTE For highly nonconforming flat surfaces or out of square installs it may be necessary to add an additional screw in the not pre drilled location of the mounting...

Page 8: ...channels Snap the rear channel onto the mounting channel starting at the bottom and working up to the top Use a mallet if necessary Reach behind the rear channel and make sure there is no gap between...

Page 9: ...ck edges of the installation brackets should line up with the back of the rear channel If the brackets are closer to the window move them forward IMPORTANT The front edges of the installation brackets...

Page 10: ...comb Shades LiteRise Installation Operation and Care document For PowerView shades use the control button to test the operation Refer to the Duette Honeycomb Shades PowerView Automation Installation O...

Page 11: ...e channels Install the bottom channel using the screws provided Use the screw holes closest to the sides first then space the rest of the screws approximately 12 apart Replace the bottom channel cover...

Page 12: ...Press the bottom channel firmly to the sill Snap the front channel onto the rear channel starting at the bottom and working up to the top Use a mallet if necessary Repeat for opposite side Operate th...

Page 13: ...ack of the headrail down and out from the bracket Removing the Bottom and Rear Channels If Necessary After removing the front channels and the shade remove the bottom channel If you used the screws to...

Page 14: ...tom channel is removed grasp the corner of the rear channel and peel inward If necessary use a wide flat blade screw driver or 1 putty knife between the mounting channel and the rear channel Repeat fo...

Page 15: ...ered for 5 years from the date of purchase 1 Contact your original dealer place of purchase for warranty assistance 2 Visit hunterdouglas com for additional warranty information frequently asked quest...

Reviews: