background image

2

1

click

2

1

3

X

3 mm

Install the second system without blind and front 
pro

¿

le. 

7

here must be a 

J

ap of 3 mm for the end 

cap.

Install the main shade. 

)

i

[

 the mountin

J

 bracket for 

the coupled blind. X = 70 mm

Slide the ali

J

ner throu

J

h the bracket into the bear-

in

J

.

Press the bearin

J

 and lift the blind until it snaps into 

the bracket.

Place the tube adapter on the ali

J

ner head.

)

i

[

 the blind by turnin

J

 the lockin

J

 rin

J

 a

J

ainst the 

bearin

J

.

Place the front pro

¿

le in the bracket. Pay attention 

that the front pro

¿

le slides under the nose of the   

bracket. 

7

o ali

J

n the bottom rails, push the blind a

J

ainst the 

bearin

J

 

, turn the blind, level the bottom rail with 

the other one 

5

elease to 

¿[

 the position 

3

1

ot possible when usin

J

 connector set.

7

o ad

M

ust skewin

J

, put the provided 

$

llen key into 

the screw of the leveller and turn it left or ri

J

ht to 

move the blind up and down. Support liftin

J

 of lar

J

heavy blinds with the palm of your hand.

Installation

Option: Leveller

Reviews: