
Note:
With an HC Hydrawise controller, any one of your 6 or 12 zones can be configured
to act as the pump start relay. We usually recommend wiring to the last zone that is not
being used in the controller.
Wiring to Power Source
NOTE:
Connecting the pump start relay should only be done by a licensed electrician
following local codes. Improper installation could result in shock or fire hazard.
1. To prevent electric shock, turn the main circuit-breaker switch to “off” prior to making
electrical connections.
2. Assemble conduit piping and connect AC power from the power source to one side
(LINE IN) of the relay.
3. Assemble conduit piping and connect wiring from the pump motor to the other side of
the relay (LOAD OUT).
4. Check to make sure there are no exposed or loose connections.
Copyright 2020 Hunter Industries. All Rights Reserved.
73
Summary of Contents for Hydrawise Ready
Page 1: ......
Page 50: ...CONTROLLER SCREENSHOTS Copyright 2020 Hunter Industries All Rights Reserved 50 ...
Page 58: ...Step 2 Step 3 Copyright 2020 Hunter Industries All Rights Reserved 58 ...
Page 59: ...Step 4 Copyright 2020 Hunter Industries All Rights Reserved 59 ...
Page 82: ...Copyright 2020 Hunter Industries All Rights Reserved 82 ...