OWNER’S MANUAL
| OPERATION AND MAINTENANCE MANUAL | 13
12
SYSTEM
MAINTENANCE,
MONITORING AND
SERVICE
Within the greater Canterbury area, Oasis Clearwater Systems offer an annual service and
maintenance contract to ensure your system functions correctly.
Service procedure includes the following:
1.
Visual inspection of system to ensure correct biological function of system.
2. Septic and secondary chamber checked and biological breakdown of sewage analysed
for correct operation of system. Client notified of correct timing for septic pump-out.
3. Zabel bacteriological filter cleaned and repositioned as necessary.
4. If pump fitted, unit removed, screen removed, impeller checked and unit fully cleaned
of debris/build-up.
5. Field service report presented to owner and council where applicable verifying work
carried out.
Switch
(4A Inductive Load)
Phase supply
Neutral supply
Earth supply
Pump phase
Pump neutral
Pump earth
Level float
Level float
Z54 Tank
PCB
Alarm Light
Neutr
al
24
0
VA
C
Float
Input
Auto
Chirp
Continuous