Chapter 2 • Pointing the antenna
12
1037663-0001 Revision A
9. Make a note of the following values shown on this screen.
You will need this information to point the antenna and
complete the installation.
– Azimuth
– Elevation
– Tilt angle (.74m antennas only)
– ODU polarization setting (LHCP or RHCP).
Figure 6: Terminal Pointing Info screen
Note:
The initial SQF value listed on this screen will most
likely be either 0 or 1, indicating that the demodulator is either
initializing or searching for a beacon signal, respectively.
Once the demodulator acquires the beacon signal, the SQF
value will be greater than 1.
Note:
This is the true polarization setting. Ensure that the
polarizer on the antenna radio matches this setting.
Summary of Contents for HughesNet Ka-band
Page 1: ...1037663 0001 Revision A March 26 2008 Ka Band Antenna Pointing Guide ...
Page 4: ... Contents iv 1037663 0001 Revision A ...
Page 6: ... Figures vi 1037663 0001 Revision A ...
Page 8: ... Tables viii 1037663 0001 Revision A ...
Page 14: ...Chapter 1 Introduction 6 1037663 0001 Revision A ...
Page 40: ...Chapter 2 Pointing the antenna 32 1037663 0001 Revision A ...
Page 42: ... Acronyms and abbreviations 34 1037663 0001 Revision A ...