5.
When pointing is complete, click
Close
.
6.
Click
Next
on the Receive Antenna Pointing screen.
The KA Antenna Pointing Validation screen opens, showing a summary of the squinter
pointing results.
Figure 30: KA Antenna Pointing Validation screen – final validation passed
Note:
If you open the pointing validation screen before antenna pointing is complete,
a message appears (instead of the text shown in the screen illustration above) asking
you to wait until pointing is complete. The message advises that if you exit antenna
pointing without passing final validation,
the transmitter will be disabled.
Note:
The
Results Saved
field indicates whether you saved the pointing values or
not when the DAPT prompted
Store Results?
near the end of the squinter pointing
process.
7.
This step depends on the validation test results:
• If any validation test
fails,
click
Back
to restart DAPT antenna pointing; then re-test
until all tests pass.
• If you are using satellite-based commissioning and all four validation tests
pass,
click
Next
to continue.
Note:
The
Next
button shown in
Figure 30: KA Antenna Pointing Validation
screen – final validation passed
on page 42 is present only if final validation is
successful. If any test failed, only the
Back
and
Exit
buttons are present.
• If you are following the instructions for Ka-band manual commissioning and all four
validation tests
pass,
this is the last step; click
Exit
.
When all four validation tests have passed, Ka-band pointing is complete and validated.
HN9400 Satellite Router Installation Guide
42
1038554-0001 Revision B
Commissioning the satellite router
Chapter 4
Summary of Contents for HN9400
Page 1: ...1038554 0001 Revision B March 2 2011 HN9400 Satellite Router Installation Guide ...
Page 10: ......
Page 16: ......
Page 26: ......
Page 34: ......
Page 68: ......
Page 74: ......
Page 92: ......
Page 120: ......
Page 124: ......
Page 128: ......
Page 134: ...HN9400 Satellite Router Installation Guide 122 1038554 0001 Revision B Index ...