Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4687_30-01-en-003.doc
9 Maintenance
timetable
9.1
Special advices
9.1.1 Maintenance interval
We strongly advise you to carry out inspections and maintenance work within
the specified periods as use of the equipment, the weather and malicious
vandalism cause wear and tear that compromises the safety and function of
the equipment.
9.1.2 Maintenance intervals in the event of intensive use
Please note that more frequent inspections and/or maintenance are required if
the play equipment is subject to intensive use.
9.1.3 Faults that compromise safety
In the event of a fault that compromises safety, quick action must be
taken. This may involve repairing it immediately or shutting down and
dismantling the equipment.
9.1.4 Faults that compromise function
Faults that compromise function should also be repaired immediately.
Such faults lower the value of the equipment to the user and encourage
malicious vandalism, which may render the equipment less safe. Any
damage should also be repaired immediately.