Huck 4585 PS Assembly Instructions Manual Download Page 3

HUCK Seiltechnik GmbH  • Dillerberg 3 • D-35614 Asslar-Berghausen 

[email protected] - www.huck.net

 

 

 

\\CAD1\Standard\4585\Montageanleitung\Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR.doc 

  

Contents

 

A

 

Assembly Instructions Super-Tampen-Swinger-Mini,  Art. No. 4585S ...................... 1

 

1

 

Introduction Assembling .............................................................................................. 4

 

2

 

Datasheet Super-Tampen-Swinger-Mini,   Art.-No.4585S ........................................... 6

 

3

 

Delivery contents (parts list with part numbers) ........................................................ 8

 

4

 

Erection instructions .................................................................................................. 11

 

5

 

Post installation checks ............................................................................................. 16

 

B

 

Maintenance instructions Super-Tampen-Swinger-Mini,   Art.-No. 4585S .............. 17

 

6

 

Introduction Maintenance ........................................................................................... 19

 

7

 

General maintenance information ............................................................................. 20

 

8

 

Maintenance timetable ................................................................................................ 22

 

 

Regular maintenance .................................................................................................. 23

 

9

 

Monthly maintenance ................................................................................................. 24

 

10

 

Quarterly maintenance ............................................................................................... 24

 

11

 

Half yearly maintenance ............................................................................................. 25

 

12

 

Annual maintenance ................................................................................................... 25

 

13

 

Maintenance printout .................................................................................................. 27

 

14

 

Hand over document .................................................................................................. 29

 

 

 

List of Tables 

Tabelle 3-1: Delivery contents, in words................................................................................. 8

 

Tabelle 3-2: Delivery contents, in symbols ............................................................................. 9 

Summary of Contents for 4585 PS

Page 1: ...k net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 1 A Assembly Instructions Super Tampen Swinger Mini Art No 4585 PS Operator _________________________________________________________ Location _________________________________________________________ ...

Page 2: ...tandard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 2 Revisionshistorie Revision 0 2019 04 29 Erste freigegebene Version Montageanleitung PR Revision 01 PM Aufstellansichten geändert auf 1000 mm einbautiefe geändert Alle Rechte vorbehalten Copyright 2008 Huck Seiltechnik GmbH ...

Page 3: ...ery contents parts list with part numbers 8 4 Erection instructions 11 5 Post installation checks 16 B Maintenance instructions Super Tampen Swinger Mini Art No 4585S 17 6 Introduction Maintenance 19 7 General maintenance information 20 8 Maintenance timetable 22 Regular maintenance 23 9 Monthly maintenance 24 10 Quarterly maintenance 24 11 Half yearly maintenance 25 12 Annual maintenance 25 13 Ma...

Page 4: ...tained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 Aßlar Berghausen Tel 49 6443 83 11 99 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems during in stallation or with any other questions You can reach us at the following Tel 49 6443 83 11 99 Following installation complete assembly instruct...

Page 5: ...views of the complete item We reserve the right to change technical details of our articles which are serv ing for the further development of our articles and are reasonable for the cus tomer Measurement tolerances Because of the properties and characteristics of the components minor meas urement tolerances compared to the indication on the sketches are possible This concerns all shown measurement...

Page 6: ...rete requirements 2 40 m Foundation size 1000 x 1000 x 600 mm Quantity 4x Concrete upper edge 400 mm below upper edge O K of play level Excavation size 1x 700 mm x 500 mm x 750 mm inclusive 100 mm drainage layer Surface material Description mm Minimum thickness of layer mm Maximum height of fall mm Lawn topsoil 1000 Bark mulch 20 80 Particle size 300 2000 400 3000 Wood chips 5 30 Particle size 300...

Page 7: ...ith soil class 3 and 4 with big portion of stones por tion 30 with bigger diameter of 63 mm grain size In case of sandy and soft soils the surface measure of foundations have to be enlarged for about 50 8 assembly time approx 45 minutes after concreting of the steel posts Needed persons 2 9 Possibly required spare parts can be obtained directly from your supplier or from the company Huck Seiltechn...

Page 8: ...livery contents parts list with part numbers 3 1 In words Table 3 1 Delivery contents in words Pos Quantity Element Description Size O K Missing 01 4 Douglas Fur post Ø 180 mm 3700 mm length 02 4 cover cap Ø180 mm 03 4 universal joint M18 x 220 mm 04 1 Play equipment 05 12 Self tapping screw 5 5 x 25 mm 06 1 Loctite Securing screws 3 ml 07 4 Pavement slab on site customer 300 x 300 mm ...

Page 9: ...ck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 9 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 01 4 Ø180 mm 3700 mm lang 02 4 Ø180 mm 03 4 M18x 220 mm 04 1 05 12 5 5 x 25 mm 06 1 3 ml 07 4 300 x 300 mm on site customer ...

Page 10: ...ation F Fall protection 300 mm G Drainaige layer 100 mm O K Upper edge play level PS Space requirement incl safety area Slb The shackles must be smooth running and movable Concrete upper edges rounded Foundation dimensions apply to standard soil classes 4 5 grown soil Soil class 4 Light to medium plasticity interlocked with low stone content proportion 30 over a diameter of 63 mm grain size Soil c...

Page 11: ...CK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 11 5 Erection instructions ...

Page 12: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 12 ...

Page 13: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 13 ...

Page 14: ...sslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 14 Screw locking device glue all screws nuts and sleeves with loctite not less than 5 drops except for lock nut ...

Page 15: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 15 ...

Page 16: ... safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 6 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from the playing area The equipment must not be approved for use until this check has been made 6 4 Information about i...

Page 17: ...illerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 17 B Maintenance instructions Super Tampen Swinger Mini Art No 4585S ...

Page 18: ...tandard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 18 Revision history Revision 0 2019 04 29 Erste freigegebene Version Montageanleitung PR Revision 01 PM Aufstellansichten geändert auf 1000 mm einbautiefe geändert Alle Rechte vorbehalten Copyright 2008 Huck Seiltechnik GmbH ...

Page 19: ...rried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 Aßlar Berghausen Tel 49 6443 83 11 99 Fax 49 6443 83 11 79 This equipment should only be assembled maintained and repaired by...

Page 20: ...t uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 8 4 Spare parts All spare parts must conform to the manufacturer s specifications 8 5 Identifying spare parts All spare parts are listed in the parts list The parts list follows the installation requirements 8 6 Special instruc...

Page 21: ...ways be tightened and checks carried out to ensure that there are no missing screws e g look out for holes you can see through 8 12 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installa tion disassembly maintenance repairs and faults 8 13 Claims liability for faults Steel posts and footings are guaranteed if regular maintenance is carried out and rec...

Page 22: ... equipment 9 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 9 1 3 Faults that compromise safety In the event of a fault that compromises safety quick action must be tak en This may involve repairing it immediately or shutting down and dis mantling the equipment 9 1 ...

Page 23: ...UCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Standard 4585 Montageanleitung Super_Tampen_Swinger_Mini_4585_PS_B_L_1_GBR doc 23 10 Regular maintenance ...

Page 24: ...ck all attachments such as chains ropes nets etc for damage and replace if necessary 11 6 Check rubber parts sleeves etc for wear and tear or damage and re place if necessary 11 7 If necessary remove excess padding material from the post footings due to danger of rotting 11 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if ne...

Page 25: ...een added or replaced Annual Maintenance 14 Annual maintenance 14 1 Ascertaining that the equipment foundations and surfaces are safe for operation 14 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by s...

Page 26: ......

Page 27: ...____ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date of inspection Inspector O K Accessible Barriered Defects Repaired by Date Please copy and return once a year after main inspection has been carried out to the manu...

Page 28: ......

Page 29: ..._______________________________________________________ ____________________________________________________________________ Competent person in charge ____________________________________________________________________ ____________________________________________________________________ Installation company address ____________________________________________________________________ ____________...

Reviews: