HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen
\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\5000-6-6\Spider_5000_6_6_ST_B_L_1_GBR.doc
39
15
Hand over document
After the installation of the equipment pass the installation and mainte-
nance documents to the operator. The operator has to receive the hand
over documents. The complete filled and signed hand over document
should be sent to the supplier Huck Seiltechnik GmbH per T49
6443 8311-79
Art.-No.:
5000-6-6
Type of item:
“Spider”
Serial number:
____________________________________________________
Customer or operator (Town, Town council, Kindergarten, etc.):
____________________________________________________________________
____________________________________________________________________
Competent person in charge:
____________________________________________________________________
____________________________________________________________________
Installation company (address):
____________________________________________________________________
____________________________________________________________________
Responsible assistant (assembler):
____________________________________________________________________
____________________________________________________________________
Received the complete assembly instructions, maintenance instructions and mainte-
nance printout,
____________________________________________________________________
(Signature of operator)
(Signature of installation company)
(Stamp)
Date: ________________________