background image

HUCK Seiltechnik GmbH  • Dillerberg 3 • D-35614 Asslar-Berghausen 

[email protected]

 - 

www.huck.net

 

 

 

 

 

A

 

Assembly Instructions 

Spider Art. No. 5000-6-6

 

 

 
 

 

Operator:  _________________________________________________________ 
 
 
Location:  _________________________________________________________ 

Summary of Contents for 5000-6-6

Page 1: ...614 Asslar Berghausen seiltechnik huck net www huck net 1 A Assembly Instructions Spider Art No 5000 6 6 Operator _________________________________________________________ Location ___________________...

Page 2: ...t CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 2 Revision history Revision 0 2013 10 24 The first allowed version FH Assembly instruction Revision 8 2020 05 28 Da...

Page 3: ...y contents parts list with part numbers 7 4 Required Spaces Top view 11 5 Post installation checks 26 B Maintenance Instructions Spider Art No 5000 6 6 27 6 Introduction Maintenance 29 7 General maint...

Page 4: ...bH Adress Huck Seiltechnik GmbH Dillerberg 3 D 35614 A lar Berghausen Tel 49 6443 83 11 0 Fax 49 6443 83 11 79 Please do not hesitate to call your supplier if you have any problems during in stallatio...

Page 5: ...be excavated 6 x 1 70 m long x 1 70 m wide total depth 1 20 m 1 x 1 20 m long x 1 20 m wide total depth 1 10 m including 10 cm drainage Foundation edges must be rounded off min R 100 mm Sizes of funda...

Page 6: ...views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measuremen...

Page 7: ...Post Connecter pre assembled on Pos 2 360 mm 7 1 Threaded bolt Nut Nylock nut Washer M 16 x 165 mm 8 6 Turnbuckles M 20 Stainless 9 6 Anker chains 13 mm x 1 60 m 10 12 Shackles M12 11 6 Foundation an...

Page 8: ...000_6_6_ST_B_L_1_GBR doc 8 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 upper steel mast 193 7 x 6 3 mm 7 22 m long 2 1 Spider Net component 3 2 membrane preassembled...

Page 9: ...hains 1 60 m lenght 10 12 Shackles M12 galvanized 11 6 Foundation ankers 20 mm galvanized approx 750 m lengt 12 1 Steel Base Plate 500 mm x 500 mm 13 1 Lifting Rope 14 1 Assembley Ring must be removed...

Page 10: ...ausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 10 Table 3 2 Delivery contents in symbols Pos Quantity Symbol 20 1 Middle Fou...

Page 11: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 11 4 Required Spaces Top view Minimum space required by law...

Page 12: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 12 Recommended minimum sp...

Page 13: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 13 Screw locking device glue all screws nuts and sleeves with loctite not less than 5 drops except for lock...

Page 14: ...K Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 14 Foundation plan Side v...

Page 15: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 15 Foundation plan Top view...

Page 16: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 16...

Page 17: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 17 Installing...

Page 18: ...Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 18 Installing Pos 2 Raise...

Page 19: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 19 Net Alignment...

Page 20: ...lerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 20 Net Tensioning Apply tension with 2 persons...

Page 21: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 21...

Page 22: ...eiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 22 Remove Installment Ring P...

Page 23: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 23 Install Pos 4 and Pos 7 using Pos 15 Loctite...

Page 24: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 24...

Page 25: ...must be erected vertically with plumb line accuracy ML Post length above ground level Mo Connect O K Upper edge of playing level O K F Upper edge of foundation PS Impact area 109 m2 R Radius VO Preas...

Page 26: ...safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal...

Page 27: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 27 B Maintenance Instructions Spider Art No 5000 6 6...

Page 28: ...CAD1 Huck SG_Mont Anl Huck Mont Englisch 5000 6 6 Spider_5000_6_6_ST_B_L_1_GBR doc 28 Revision history Revision 0 2013 10 24 The first allowed version FH Maintenance instruction Revision 8 2020 05 28...

Page 29: ...is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier or from Fa Huck Seiltechnik GmbH Adress Huck Sei...

Page 30: ...uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare par...

Page 31: ...ensure that there are no missing screws e g look out for holes you can see through 7 12 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installa tion disa...

Page 32: ...equipment 8 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 F...

Page 33: ...HUCK Seiltechnik GmbH Dillerberg 3 D 35614 Asslar Berghausen seiltechnik huck net www huck net 33 9 Regular maintenance...

Page 34: ...ll attachments such as chains ropes nets etc for damage and replace if necessary 10 6 Check rubber parts sleeves etc for wear and tear or damage and re place if necessary 10 7 Check the surface of woo...

Page 35: ...Annual maintenance 13 1 Ascertaining that the equipment foundations and surfaces are safe for operation 13 2 In particular the equipment should be checked for decay and corrosion It may be necessary...

Page 36: ......

Page 37: ...__ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ T...

Page 38: ......

Page 39: ..._____________________________________________ ____________________________________________________________________ Competent person in charge __________________________________________________________...

Reviews: