Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
• www.huck.net
\\CAD1\Standard\4959-20\Montageanleitungen\Abenteuerbruecke_mit_Holzsteg_4959_20_ST_B_L_1_GBR.doc
- 25 -
16 Hand over document
After the installation of the equipment pass the installation and mainte-
nance documents to the operator. The operator has to receive the hand
over documents. The complete filled and signed hand over document
should be sent to the supplier.
Art.-No.:
4959-20
Type of item: Adventure Bridge with wooden rungs
Serial number: _________________________________________________
Customer or operator (Town, Town council, Kindergarten, etc.):
______________________________________________________________
______________________________________________________________
Competent person in charge:
______________________________________________________________
______________________________________________________________
Installation company (address):
______________________________________________________________
______________________________________________________________
Responsible assistant (assembler):
______________________________________________________________
______________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance printout .
______________________________________________________________
(Signature of operator)
(Signature of installation company)
(Stamp)
Date: ___________________
Summary of Contents for 4959-20
Page 24: ......