Service/maintenance
Chapter 7
OPERATION MANUAL
V2.4.0en/09.08.21//1.30
Minichiller®
47
7.2
Maintenance
Cleaning/maintenance while the temperature control unit is operating
MORTAL DANGER FROM ELECTRIC SHOCK
Stop an ongoing temperature control process.
Turn off the temperature control unit.
Also disconnect the temperature control unit from the power supply.
Performing maintenance work not described in these operation manual
MATERIAL DAMAGE ON THE TEMPERATURE CONTROL UNIT
Please contact Huber for maintenance work that is not described in these operation manual.
Maintenance work not described in these operation manual is reserved for qualified specialists
trained by Huber.
Safety-relevant components may only be replaced by equivalent ones. The specified safety
values for the respective component must be observed.
7.2.1
Function check and visual inspection
Cooling*
Description
Maintenance
interval
Comment
Person re-
sponsible
A/W
Visually inspect
hoses and hose
connections
Prior to switching
on the tempera-
ture control unit
Exchange leaking hoses and hose
connections prior to switching on the
temperature control unit.
→
Page
Operating
company and /
or operators
A/W
Check the fill level
in the collecting
container at the
>Overflow<
[12]
(if
present)
Prior to switching
on the tempera-
ture control unit
Check the fill level in the collecting
container. Empty as required. Follow
the instructions for the proper
disposal of thermal fluid.
→
Page 15,
section
Operating
company and /
or operators
A/W
Inspection in ac-
cordance with the
F-Gas Directive
In accordance
with the F-Gas
Directive
→
control units with fluorinated
greenhouse gases/refrigerants«
Operating
company
A/W
Check the power
supply cable
Prior to switching
on the tempera-
ture control unit
or on relocation
Do not start the temperature
control unit if the power supply
cable is damaged.
Qualified
electrician
(BGV A3)
A
Clean the perforat-
ed sheet
As required
Clean the perforated sheet of the
temperature control unit with a
damp cloth
Operating
company
A/W
Thermal fluid
inspection
As required
–
Operating
company and /
or operators
A/W
Check the mechan-
ical seals
Monthly
→
Operating
company and /
or operators
A
Check the liquefier
fins
As required, after
3 months at the
latest
→
er fins (air-cooled temperature
Operating
company and /
or operators
W
Check the hat-type
strainer (dirt trap)
As required, after
3 months at the
latest
→
type strainer (dirt trap) (water-
Operating
company and /
or operators
A/W
Overtemperature
protection (OT) -
functional check
Every month or
after changing the
thermal fluid.
→
Operating
company and /
or operators
Inspection intervals
Summary of Contents for MPC Minichiller 280
Page 1: ...MPC Minichiller...
Page 2: ......
Page 3: ...OPERATION MANUAL MPC Minichiller...
Page 4: ......
Page 10: ...OPERATION MANUAL Minichiller V2 4 0en 09 08 21 1 30 10...
Page 59: ...Annex Chapter 9 OPERATION MANUAL V2 4 0en 09 08 21 1 30 Minichiller 59 9 Annex...