INSTALLATION MANUAL
MASTERLINE Ultimate Small Cell
Page 4 of 4
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the gen-
eral handling of these products please contact HUBER+SUHNER.
Step 6:
Connect the Small Cell housing to the RRH
using jumper cables.
The connectors can be engaged in the ports
provided by applying gentle pressure. Turn it
gently in the opposite direction to check that
the connector is properly engaged.
Please refer to the general instructions in the
user manual for guidance on handling cables
and laying multi-connector cables.
Step 7:
All jumper cables must be fastened at regular
intervals of not more than 1 meter using cable
clamps.
Step 8:
Once all the jumper cables have been con-
nected, the main line can be connected to the
base station or to the fiber-optic cable.
The protective tube must be removed before
connecting.
When untwisting the protective tube, ensure
that the cable is not twisted around its own
axis.
Step 9:
Connect the Small Cell housing to the base
station using suitable cables.
The connectors can be engaged in the ports
provided by applying gentle pressure. Turn it
gently in the opposite direction to check that
the connector is properly engaged.
Please refer to the general instructions in the
user manual for guidance on handling cables
and laying multi-connector cables.