INSTALLATION MANUAL
IANOS EDR (Equipment Distribution Rack) chassis
Page 3 of 15
INSTALL IANOS 1U OR 4U CHASSIS IN RACK
Step 8
Step 9
Step 10
Step 11
Step 12
Step 13
Step 14
Step 15
REAR CABLE MANAGER FOR 1U AND 4U (OPTIONAL)
Step 16
Step 17
Step 18
This document is downloaded via www.farbin.ir as an authorized distributer in IRAN.
This document is downloaded via www.farbin.ir as an authorized distributer in IRAN.