Fig. 2
Fig. 3
Supply runs directly to the fixture
Page 1: ...h to door jamb when installed 3 Remove a knock out in Junction Box to accommodate cable entry 4 Insert cable through knock out and secure to box with approved connector not provided 5 Fasten box to door jamb with 4 wood screws provided 6 Connect GREEN BARE ground wire to ground screw in back of junction box connect Line and Load wires to switch pig tail wires following national and local electrica...
Page 2: ...Fig 2 Fig 3 Supply runs directly to the fixture ...