![Hubbell Gai-Tronics REDA LERT 234 Manual Download Page 9](http://html1.mh-extra.com/html/hubbell/gai-tronics-reda-lert-234/gai-tronics-reda-lert-234_manual_2180430009.webp)
Pub. 42004-510C
234/234SBA RED ALERT
®
Tower Assemblies
Page 8 of 14
P:\Standard IOMs - Current Release\42004 Instr. Manuals\42004-510C.docx
11/19
Figure 6. Exploded View
4.
Verify that a ¼-inch minimum air gap exists between the base of the tower and the top of the concrete
pier (see Figure 7).
N
OTE
:
The air gap must not be obstructed with soil, mulch, stone, etc. Failure to maintain the air gap
will cause moisture entrapment that will result in corrosion.
Figure 7. Assembled View