Hubbell CE110 Installation, Operation And Maintenance Manual Download Page 12

SECTION III

 - SCHEDULED MAINTENANCE AND OPERATION 

 

WARNING / CAUTION

 

 

Before performing any maintenance procedure, 

make certain power supply is OFF and 

cannot accidentally be turned on. 
 
Exposure to 125°F or hotter water can cause scalding injuries. Appropriate caution must be 
taken when using hot water. Special supervision must be given to those who cannot react 
quickly such as children, invalids, or elderly persons. 
 

MAINTENANCE AND OPERATION

 

The water heater is automatic in its operation. It will maintain a full tank of water at the 
temperature setting of the thermostat. The water heater should not be turned on without first 
making sure that the tank is full of water and that all air has been released. 
 

FREEZING

 

The tank should be fully drained in the event the electricity has been turned off and if there 
is danger of freezing. 
 

QUARTERLY INSPECTION 

 

1.

 

Water temperature regulation. 
a.

 

Let water heater completely heat to a designated thermostat setting. 

b.

 

After thermostat satisfies (i.e., when the thermostat actually clicks off), draw water from 
heater. 

c.

 

Measure the maximum temperature with an accurate thermometer. 

d.

 

If the temperature is above the safe limits for your circumstances call a service man to 
adjust or replace the control. 

2.

 

Lift test lever on relief valve and let water run through valve for a period of 
approximately 10 seconds. This will help flush away any sediment that might build up in 
water passageways. 

3.

 

Inspect element flange for leakage as follows: 
a.

 

Shut off Power Supply. 

b.

 

Remove element housing cover. 

c.

 

Visually inspect heating element for evidence of   leaks.  

d.

 

Rub finger around heating element and check for any evidence of moisture. If 
moisture is present or a water drip is observed, follow procedure outlined in Section 
V. 

4.

 

Check for loose electrical connections. Tighten as necessary. 

 

ANNUAL INSPECTION 

1.

 

Flush tank as follows 
a.

 

Shut off power supply. 

b.

 

Attach a hose to the drain valve installed in the cold water piping. 

c.

 

Close valve on the cold water line to the heater. 

d.

 

Open the drain valve and direct the water to a drain. 

e.

 

Open hot water faucet to admit air into the tank. 

f.

 

Close drain valve and hot water faucet. 

g.

 

Open valve on the cold water line to the heater. 

h.

 

Turn power supply ON. 

 

 

12

Summary of Contents for CE110

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER BASE MODEL CE110 2009 Edition...

Page 2: ...93 INTERNET http www hubbellheaters com IMPORTANT Always reference the full model number and serial number when calling the factory The following information should be noted at time of installation an...

Page 3: ...d casualties always turn the power supply safety switch to off turn the charge or ground the circuit before performing any maintenance or adjustment procedure 7 This appliance is designed to store wat...

Page 4: ...OF CONTENTS SECTION TITLE PAGE I GENERAL INFORMATION 6 II INSTALLATION GUIDELINES 8 III SCHEDULED MAINTENANCE AND OPERATION 14 IV TROUBLESHOOTING 16 V SERVICING AND REPLACEMENT OF PARTS 17 VI WARRANTY...

Page 5: ...s heavy gauge steel finished with high gloss enamel Insulation consists of high density fiberglass blankets Temperature Pressure Safety Relief Valve Hot Water Outlet Cold water inlet not shown on bott...

Page 6: ...overflow line should be utilized from the relief valve outlet to a floor drain See drawing for locations and sizes HEATING ELEMENT The water heater is supplied with either a 1000 watt or a 450 watt e...

Page 7: ...r Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 A relief valve is designed to discharge excessively hot water THE CUSTOMER IS RESPONSIBLE TO PROTECT PROPERTY AN...

Page 8: ...alve and tank or in the drain line FILLING THE HEATER 1 Completely close the drain valve 2 Open the highest hot water faucet to allow all air to escape from piping 3 Open the valve to the cold water i...

Page 9: ...ld water line f Hot water line connected to hot water outlet on tank g Temperature and pressure relief valve installed h Relief valve overflow line installed i Water heater filled with water j Power l...

Page 10: ...ION WITHOUT TEMPERING VALVE Piping to Hot Water Piping from Cold Water Air Gap Drain Valve Relief Valve Discharge Pipe Temperature Pressure Relief Valve Support Bracket bottom bracket not shown Floor...

Page 11: ...TH TEMPERING VALVE Piping to Hot Water Tempering Valve Support Bracket bottom bracket not shown Air Gap Floor Drain Relief Valve Discharge Pipe Temperature Pressure Relief Valve Piping from Cold Water...

Page 12: ...ly clicks off draw water from heater c Measure the maximum temperature with an accurate thermometer d If the temperature is above the safe limits for your circumstances call a service man to adjust or...

Page 13: ...mit switch tripped Reset high limit switch Loose wires Tighten wires Torque screws per torque chart included in Section VI Heating element inoperable Check heating element operation by clamping an Amp...

Page 14: ...screws 5 Replace control and install new high limit switch by performing above steps in reverse order refer to wiring diagram in Section II Torque screws per chart in back HEATING ELEMENT 1 Disconnect...

Page 15: ...all access cover 13 Fill tank and check around element for any leaks THERMOSTAT 1 Disconnect power from unit 2 Remove access cover and locate thermostat 3 Disconnect the two 2 control wires Wires Capi...

Page 16: ...e to relieve pressure in tank 4 Disconnect overflow piping 5 Unscrew relief valve remove assembly and replace with new one 6 Connect overflow piping 7 Turn on incoming water supply and check for leaks...

Page 17: ...the Company TANK REPLACEMENT POLICY TEN YEARS This section outlines the ten year limited replacement policy for tanks that fail due to the corrosive effects of water Duration Ten years from date of or...

Page 18: ...y term of this agreement and will not extend beyond that one year limitation The parts of this warranty including the incorporated users manual that speaks specifically to terms and condition are deem...

Page 19: ...NOTES 19...

Page 20: ...P O BOX 288 STRATFORD CT 06615 0288 PHONE 203 378 2659 FAX 203 378 3593 INTERNET http www hubbellheaters com 20...

Reviews: