background image

Page 2

Kim Lighting • 16555 E. Gale Ave. • P.O. Box 60080 • City of Industry, CA  91716-0080 • 626/968-5666 • FAX 626/330-3861

Vandal Resistant Bollard 

Installation Instructions

VRB1/VRB3 & VRB2/VRB4

4. Tighten the two 

C

" set screws at

the bottom of the pole using a 

F

ball end hex key.

FIXTURE INSTALLATION INSTRUCTIONS:             

Make certain the electrical supply is 

OFF

before starting fixture installation.

!

1. To protect finish, lay fixture horizontally on soft cloth with open-end of fixture next to installed base/casting

assembly.

2. Connect fixture ground lead

(green) to the green wire con-
nected to the grounding lug on the
ballast bracket.  Connect the lamp
leads to the ballast. 

NOTE:

For incandescent fixtures,

connect the power supply leads
directly to the lamp leads.

3. Place pole body over ballast

assembly and slowly turn until it
drops into retaining slots.  Then
twist clockwise 45° to lock the pole
onto the base casting.

LAMP INSTALLATION  OR REPLACEMENT INSTRUCTIONS: 

Make certain electrical supply is 

OFF

before starting installation or replacement.

1. Locate two 

J

-20 button head socket screws (180°

apart) concealed under top cap.  Feel for screw
heads approximately 

L

” up under top cap

between vertical ribs.  The screw heads are only
visible from low angles near the fixture body.
Loosen - 

do not remove

- screws with a standard

5/32

” hex key.  Turn top cap clockwise and lift up to

remove.

!

All Field Wires and Connections
Must Remain Well Below Ballast

Level

Grade

Conduit Stub

Up 3" Max.

2. Remove 

J

-20 hex nut securing one end of globe

retaining strap.  Loosen the other hex nut and pivot
retaining strap to side or remove.  Lift globe up to
remove.

Retaining
Strap

Globe

Pressure Pad

Reviews: