
Huazheng Electric Manufacturing Co.,Ltd
6
Please click the "next" button on the screen to enter the test program interface.
Then click the "start" button, turn ratio and wiring method will be tested
automatically.
Figure:
5.1 Parameter Setting
Set parameters before the test. Click the “parameter settings” button to enter the
parameter settings interface.
Figure:
Click the input box which needs to be set.
Storage No.
: To set the record number of the test is to be stored.
Transformer No.
: store information of the transformer under test.