Huazheng HGZ-500 User Manual Download Page 5

3

consumed, and only distilled water is added (it is recommended to replace the electrolyte

once every 6-7 months and reprepare it with the same method as before).

VI.Special Note

1. If the pressure indicated by the pressure gauge is low or the digital display is larger than

usual, it is generally caused by air leakage, and should be fully leaked. In particular, when

replacing the sealing port of the color-changing silicone, do not squeeze foreign matter on

the upper and lower thread seals.

2. Air source instruments are strictly forbidden to start with no load. If the machine is not

turned on for a long time, the electrolyte should be extracted;

3. After pouring the prepared lye into the water tank, the sealed inner cover of the water

tank should not be installed any more, because the gas tank is generated when working,

just need to install the outer cover.

VII.Quality Assurance

1. The whole machine shall be guaranteed for one year from the date of sales. Within the

warranty period, it shall be maintained free of charge and enjoy lifelong maintenance

services.

2. If users encounter product quality or technical problems during use, they are welcome

to consult.

VIII.Packing List

No.

Item

Qty

1

Main engine

1

2

Sealing pressure caps(M8×1)

2

3

Rubber sealing ring

8

4

Fuse pipe(10A)

2

5

Power line

1

6

Analytical pure potassium hydroxide (for electrolyte
solution) 200g

1

Reviews: