Checking the Hardware Installation

Check Items for Cable Installation

b

NO.

Check Item

1

All cables are connected securely and reliably. Pay special attention to the communication cable 
connections and cable connections at the bottom of the cabinet. 

2

Different types of cable, such as power cables, PGND cables, feeders, optical fibers, and signal cables 
are separately bound.

3

The connectors of the RF cables are fixed in position. An incorrect connection may cause an abnormal 
voltage standing wave ratio (VSWR).

6

Check Items for Electrical Connections

c

NO.

Check Item

1

All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such 
as a switch or fuse is allowed for the electric connection of the grounding system. No short circuit is 
allowed.

2

The PGND cable is securely connected and the AC lead-in cable and cables in the cabinet are correctly 
connected according to the electrical design of the power system. The screws are tightened. In addition, 
the inputs or outputs are not short-circuited.

3

The redundant part of the power cable or PGND cable is cut rather than coiled.

4

The terminals at two ends of each power cable or PGND cable are securely soldered or crimped.

5

The bare wires and the terminal handles at the wiring terminals are coated with heat shrink tubing.

6

A flat washer and a spring washer are well mounted on each OT terminal.

Checking the Power-on State of a BBU

Indicators

NOTICE

The device must be powered on within seven days because it is unpacked. The power-off duration cannot exceed 48 hours 
in the later maintenance.

The power supply switch on the right side of the BBU is turned off.

Board

Indicator

Normal Status

PMU

RUN

Blinking

ALM

Off

PSU

Power supply

Steady green

Faulty

Off

UMPT, 

LMPT, 
UBBP, 

LBBPd4

RUN

On for 1s and off for 

1s

ALM

Off

ACT

On

UPEU

RUN

On

FAN

STATE

Blinking green (on 

for 1s and off for 1s)

Start

Turn on the external power switch

End

Are the external 

input power in the BBU 

normal?

Power on the BBU

No

No

Rectify faults

Rectify faults

Yes

Yes

Are the LEDs on 

the boards in the 

BBU normal?

Summary of Contents for V100R005C10

Page 1: ...lectrostatic damage to the subrack Only when the BBU install in TP48200A and APM30H cabinets subrack cable claws are configured Other cabinets carry on next step directly NOTE The figure shows only installation slots for the main processing board core network processing board baseband processing board fan module and power module in the typical configuration If you need to install the USCUb22 UEIU ...

Page 2: ...inet interior using cable ties 2 Install a ground cable for the GPS SPD 3 Install a clock signal cable for the GPS SPD 1 Connect the N50 straight female connector of the clock signal cable to the PROTECT terminal on the GPS SPD using a torque wrench to a torque of 4 N m 2 Connect the SMA male connector of the GPS clock signal cable to the GPS port on the UMPT LMPT USCUb22 4 Connect the GPS SPD jum...

Page 3: ...ler of an optical module and insert the optical module into the SFP0 SFP1 port on the LMPT the FE GE1 port on the UMPTb2 or the XGE1 XGE3 port on the UMPTe3 Then raise the puller 2 Remove the dustproof cap from the optical fiber Connect an FE GE optical fiber to the optical module 4 Install the winding pipe at the end of the optical fiber Ensure that the winding pipe is installed at the position b...

Page 4: ...BBU cable claw positions 5 Install the winding pipe at the end of the optical fiber Ensure that the winding pipe is installed at the position between the optical fiber connector and the first optical fiber binding point The method is the same as that for installing an optical fiber Installing a GPS Clock Signal Cable 1 Connect the SMA end of the GPS clock signal cable to the GPS port on the UMPT L...

Page 5: ...g to the network planning the boards in the BBU are inserted in the proper slots and secured 2 The subrack which is used to install the BBU is steady installed 3 According to the network planning the BBU cables are properly installed and secured 4 The GPS antenna must be installed in an area with an open view and far from high buildings The vertical view angle of the GPS antenna must be greater th...

Page 6: ... power system The screws are tightened In addition the inputs or outputs are not short circuited 3 The redundant part of the power cable or PGND cable is cut rather than coiled 4 The terminals at two ends of each power cable or PGND cable are securely soldered or crimped 5 The bare wires and the terminal handles at the wiring terminals are coated with heat shrink tubing 6 A flat washer and a sprin...

Page 7: ...of the bare crimping terminal and the conductor 4 Install the heat shrink tubing Crimping tool NOTICE Heat the heat shrink tubing until it tightly clings to the connector Do not overheat the heat shrink tubing preventing the insulation layer being burnt The heat shrink tubing must be fixed to cover the cable conductor NOTICE Ensure that the metal conductor of the cable is not damaged when strippin...

Reviews: