Figure 3-36
Installing the mounting ears on the chassis
0
1
2
3
4
5
6
7
8
9
10
11
0
1
RST
SYS
ALM
PWR
HDD
MGMT
MODE
0/1
3
2
CONSOLE
MGMT
Secospace USG6000
M4
Step 2
Install cabinet guide rails and floating nuts.
The USG supports the adjustable guide rails (parts 21241561 and 21242247) and L-shaped
guide rails. The installation method varies with the guide rail type.
NOTE
Adjustable guide rails 21241561 are delivered earlier and no longer delivered after they run out. Then
adjustable guide rails 21242247 are delivered.
1.
Determine the positions for installing the guide rails and floating nuts, as shown in
.
NOTICE
Install the two guide rails at the same height to ensure that the device is level.
Figure 3-37
Positions of L-shaped guide rails and floating nuts
1U
L bottom of the L-shape guide rail
For floating nuts
(device nuts)
HUAWEI USG6000 Series
Hardware Guide
3 Hardware Installation
Issue 08 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
287