Procedure
l
Power on the USG.
The USG starts after the switch of the power supply device is turned on.
You can identify the USG status based on indicators on the front panel. Indicators shown
in
indicate that the USG is running normally.
Figure 3-35
Indicators when the USG6310/6320 runs normally
PWR SYS ALM USB
Secospace USG6000
1
3
5
7
0
2
ETH
4
6
SYS: blinking green
(once every two seconds)
PWR SYS ALM USB
ALM: off
PWR: steady green
l
Power off the USG.
NOTICE
Before powering off the USG, ensure that configuration data is saved. Otherwise, the
configuration data may be lost.
If the USG will be administratively shut down for a long time, turn off the power switch.
After powering off the USG, set it aside properly according to storage requirements.
----End
Follow-up Procedure
After the USG is powered on, you can log in to the configuration page for management and
maintenance. For details, refer to the
Administrator Guide
.
3.4 Installing a 1 U Device
(USG6306/6308/6330/6350/6360/6370/6380/6390/6390E/
6507/6530/6550/6570/6620/6630)
This chapter provides the cabinet-mounting, workbench-mounting, cable connection, and
expansion card installation methods of the
USG6306/6308/6330/6350/6360/6370/6380/6390/6390E/6507/6530/6550/6570/6620/6630
series.
HUAWEI USG6000 Series
Hardware Guide
3 Hardware Installation
Issue 08 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.