Figure 5-4
Setting network parameters
After network parameters are set, connect the UPS to the network, ensuring that
maintenance personnel can manage or control the UPS remotely. If remote management
is not required, set the UPS based on the default configurations.
4.
On the
System Param.
screen, select
Single
(default value) or
Parallel
, as shown in
. Set the voltage level, output frequency, battery capacity, and the number of
System parameter settings determine normal UPS operation. Note the following:
Set
Single/Parallel
after confirmation.
Voltage level
refers to the line voltage level. Set it based on the site requirements.
Set
Output frequency
correctly; otherwise, loads may not work properly.