TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
5 Installing Ground Cables
Issue 01 (2013-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
48
Installing an Equipotential Ground Cable for Added Battery Cabinets
Step 1
Route an equipotential ground cable for the added battery cabinet into the battery cabinet
through the package entry module in the battery cabinet.
Step 2
Connect one end of the equipotential ground cable to the ground bar in battery cabinet 1, and
the other end to the ground bar in the added battery cabinet, as shown in
Figure 5-3
Installing an equipotential ground cable for added cabinets
(1) Ground bar in battery cabinet 1
(2) Ground bar in the added battery cabinet
----End