Figure 5-10 Installing the front and rear ends of a holding rail
2. Insert the positioning pins on the rear of the rail into the square holes in the
cabinet. See (3) in
.
3. Align the front with a square hole, and push the holding rail forward until it
snaps into place. See (4) in
.
4. Push the hook backwards so that its metal sheet touches the mounting bar.
.
5. (Optional) Install an M6 screw in the third square hole at the rear of the
holding rail to secure it. See (6) in
6. Install the other holding rail in the same way.
Step 2 Install the server.
1. Pull out the inner rails as far as they will go. See
.
TaiShan 200 Server
User Guide (Model 2280)
5 Install and Configure
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
51