Figure 5-6 Installing the server
3. When the two mounting ears of the server come into contact with the
mounting bars on the cabinet, tighten their captive screws to secure the
server. See (2) in
Step 4 Connect power cables to the server and power on the server. Connect a network
cable, a VGA cable, or USB devices as required.
----End
5.4.3.2 Installing with Adjustable Guide Rails
Adjustable guide rails are for a cabinet with a depth of 543.5 mm to 848.5 mm
(21.40 in. to 33.41 in.) between the front and rear mounting bars.
The servers are stackable onto adjustable guide rails.
Step 1 Install the adjustable guide rails.
1. Position a guide rail horizontally in contact with the mounting bars and hook
it onto the cabinet. See (1) in
The three holes in each mounting ear of a guide rail should be within 1U boundary
lines.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
80