Table 7-3 LED indicator description
LED Indicator
Status
Meaning
Green off
There is no operation
with a USB flash drive.
Blinking green slowly
There is an operation
with a USB flash drive.
Blinking green fast
An operation with a
USB flash drive has
failed.
Steady green
An operation with a
USB flash drive is
successful.
7.1.4 Upgrading
Procedure
1. Download the required software upgrade package from the technical support
website.
2. Decompress the upgrade package.
NO TE
If the login password for logging into the SUN2000 app or entering the Device
Commissioning screen on the FusionSolar app is the initial password, you do not need
to perform steps
. If not, perform steps
.
3. Click Local maintenance script on the app to generate a boot script file, see
the
FusionSolar APP and SUN2000 APP User Manual
.
4. Import the boot script file to a PC.
5. Replace the boot script file (sun_lmt_mgr_cmd.emap) in the upgrade package
with the one generated by the app.
6. Copy the extracted files to the root directory of the USB flash drive.
7. Connect the USB flash drive to the USB port. The system automatically
identifies the USB flash drive and executes all commands specified in the boot
script file. View the LED indicator to determine the operating status.
NO TICE
Ensure that the ciphertext in the boot script matches the login password for
logging into the SUN2000 app or entering the Device Commissioning screen
on the FusionSolar app. Otherwise, the user account will be locked for 10
minutes after the USB flash drive is inserted for five consecutive times.
SUN2000-(60KTL, 65KTL)-M0
User Manual (Mexico Edition)
7 Man-Machine Interactions
Issue 06 (2020-10-12)
Copyright © Huawei Technologies Co., Ltd.
75