20
•
If Smart PV Optimizers are configured for PV strings, ensure that the Smart PV Optimizers have
been successfully connected to the solar inverter before performing the operations in this
section.
•
The PV strings connecting to the same MPPT route should contain the same number and
model of PV modules or Smart PV optimizers.
•
Check that the SN labels of Smart PV Optimizers are correctly attached to the physical layout
template.
•
Take and save a photo of the physical layout template. Place the template on a flat surface.
Keep your phone parallel to the template and take a photo in landscape mode. Ensure that the
four positioning points in the corners are in the frame. Ensure that each QR code is attached
within the frame.
•
For details about the physical layout of Smart PV Optimizers, see
FusionSolar App Quick Guide.
Setting the Physical Layout of Smart PV Optimizers
6.4
Scenario 1: Setting on the FusionSolar Server Side (Solar Inverter Connected to
the Management System)
1. Tap the plant name on the
Home
screen to access the plant screen. Select
Plant layout
, tap
and upload the physical layout template photo of the PV plant as prompted.
2. Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the FusionSolar Smart PV
Management System. On the
Homepage
page, click the plant name to go to the plant page.
Select
Plant layout
. Choose >
Generate with AI
, and create a physical layout as
prompted. You can also manually create a physical location layout.