RRU5303
Installation Guide
6 Hoisting an RRU and Related Cables onto a Tower
Issue Draft B (2018-05-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
42
Figure 6-7
Binding optical fibers
(1) Lifting sling
(2) Stretch sling
(3) Traction sling
Do not remove the stretch sling and protection pipe or bind optical fibers using one sling, as
shown in Figure 6-8.
Figure 6-8
Incorrect binding method
3.
Installation engineer B rotates the fiber spools at the speed of 5 m (16.4 ft) to 15 m
(49.21 ft) per minute to coil the optical fibers.