![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 361](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487361.webp)
6.37.1 Example for Configuring the ICMP Test
Networking Requirements
, Switch A and Switch B must be connected at Layer 3 through the
VLANIF interface.
Switch A functions as the NQA client to check whether Switch B is reachable.
Figure 6-3
Networking diagram for configuring the ICMP test
GE1/0/0
VLANIF10
10.1.1.1/24
VLANIF10
10.1.1.2/24
GE1/0/0
SwitchA
SwitchB
NQA agent
Configuration Roadmap
The configuration roadmap is as follows:
1.
Perform the NQA ICMP test to check whether the route between the local end (Switch A)
and the specified destination end (Switch B) is reachable and check the RTT of a test packet.
Data Preparation
To complete the configuration, you need the following data:
l
Host address of Switch B
Procedure
Step 1
Create a VLAN and add interfaces to the VLAN.
# Configure Switch A.
<Quidway>
system-view
[Quidway]
sysname SwitchA
[SwitchA]
vlan 10
[SwitchA-Vlan10]
quit
[SwitchA]
interface gigabitethernet 1/0/0
[SwitchA-GigabitEthernet1/0/0]
port hybrid pvid vlan 10
[SwitchA-GigabitEthernet1/0/0]
port hybrid untagged vlan 10
[SwitchA-GigabitEthernet1/0/0]
quit
# Configure Switch B.
<Quidway>
system-view
[Quidway]
sysname SwitchB
[SwitchB]
vlan 10
[SwitchB-Vlan10]
quit
[SwitchB]
interface gigabitethernet 1/0/0
[SwitchB-GigabitEthernet1/0/0]
port hybrid pvid vlan 10
[SwitchB-GigabitEthernet1/0/0]
port hybrid untagged vlan 10
[SwitchB-GigabitEthernet1/0/0]
quit
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6 NQA Configuration
Issue 03 (2010-09-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6-141