![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 277](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487277.webp)
–
Number of successful tests
–
Sum of the response time of all tests
–
RTT square sum
–
Minimum RTT and maximum RTT of the packet
–
Destination IP address and the type of the destination IP address
–
Number of the Echo packets and the sent packets
–
Time when the last packet is received
<Quidway>
display nqa results
NQA entry(admin, lspjitter) :testflag is inactive ,testtype is lspjitter
1 . Test 1 result The test is finished
SendProbe:60 ResponseProbe:60
Completion:success RTD OverThresholds number:0
Min/Max/Avg/Sum RTT:1/24/3/156 RTT Square Sum:928
NumOfRTT:60 Drop operation number:0
Operation sequence errors number:0 RTT Stats errors number:0
System busy operation number:0 Operation timeout number:0
Min Positive SD:1 Max Positive SD:22
Positive SD Number:12 Positive SD Sum:33
Positive SD Square Sum:495 Min Negative SD:1
Max Negative SD:22 Negative SD Number:12
Negative SD Sum:34 Negative SD Square Sum:498
Packet Loss Unknown:0 Average of Jitter SD:2
jitter out value:0.8977973 Packet Loss Ratio: 0%
6.18 Configuring the LSP Traceroute Test
This section describes how to configure an LSP traceroute test to check the connectivity between
Label Switching Routers (LSRs) along the LSP.
6.18.1 Establishing the Configuration Task
6.18.2 Configuring the LSP Traceroute Parameters for the LDP Tunnel
This part describes how to set parameters for an LDP LSP traceroute test.
6.18.3 Configuring LSP Traceroute Test Parameters for the MPLS TE Tunnel
This part describes how to set parameters for a TE LSP traceroute test.
6.18.4 Configuring the LSP Traceroute Test Parameters for the CR-LSP Hotstandby Tunnel
This part describes how to set LSP traceroute test parameters for CR-LSP hot standby tunnels.
6.18.5 Checking the Configuration
After configuring the LSP traceroute test, you can view the test result.
6.18.1 Establishing the Configuration Task
Before configuring an LSP traceroute test, familiarize yourself with the applicable environment,
complete the pre-configuration tasks, and obtain the required data. This can help you complete
the configuration task quickly and accurately.
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6 NQA Configuration
Issue 03 (2010-09-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6-57