![Huawei PowerCube 500 PC500-300G1 Quick Manual Download Page 10](http://html.mh-extra.com/html/huawei/powercube-500-pc500-300g1/powercube-500-pc500-300g1_quick-manual_169591010.webp)
10
Battery cable terminal
AC input, PV input cable terminal
Preparing Cable Terminals
11.3
8. Install optical fibers.
9. Close the maintenance compartment door.
10.Push down the
sunshade until
the spring
fastener is stuck
gently.
Optical network
This figure uses single-ring networking as an example.
NOTE
NOTE
PV input cables can only be used in scenarios with solar energy.
PV input cables and battery cables are finished cables. You only need to strip the cables and then insert them into the cable terminals.
AC input cables need to be prepared onsite. Multi-core cables must be used; otherwise, waterproof connectors may be exposed to water
leakage.
Before assembling cables with waterproof connectors, ensure that the connections between the cables and terminals are secure and reliable.
Negative (blue)
Positive (red)
PE (green)
N/L2 (blue)
L/L1 (brown)
Cable Type
Core Cross-
Sectional Area
Cable Outer
Diameter
Battery cable (2-core)
3.3
–6 mm
2
9.0
–14.5 mm
PV input cable (2-core)
1.5
–4 mm
2
AC input cable (3-core)
1.5
–4 mm
2
Scale line
Preparing Battery Cables and Connecting Waterproof Connectors
Flat-head
screwdriver
Preparing PV Input Cables and Connecting Waterproof Connectors
Flat-head
screwdriver
Scale line
NOTE
Before closing the maintenance compartment
door, check that cables are properly installed.
After closing the door, press the left side of the
maintenance compartment door by hand and
tighten the screws.