background image

HUAWEI TECHNOLOGIES CO., LTD.

OptiX RTN 910A Radio Transmission System V100

IDU Quick Installation Guide for Outdoor Cabinets 
(OMB Cabinets)

Issue: 

01

Date: 

2018-10-30

Summary of Contents for OptiX RTN 910A V100

Page 1: ...HUAWEI TECHNOLOGIES CO LTD OptiX RTN 910A Radio Transmission System V100 IDU Quick Installation Guide for Outdoor Cabinets OMB Cabinets Issue 01 Date 2018 10 30 ...

Page 2: ...ective holders Notice The purchased products services and features are stipulated by the contract made between Huawei and the customer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS withou...

Page 3: ...ailure to do so causes serious injury or death Non standard and incorrect operations on the high voltage power supply may result in fire and electric shock Do not perform operations on high voltage and AC power supply facilities or on a tower or mast in the case of thunderstorm Failure to do so causes serious injury or death Ground the device before powering it on Failure to do so causes damage to...

Page 4: ...oreign matters from getting into the NE which may result in faults on the NE Boards are fragile and valuable When handling or placing a board exercise caution and put it into a dedicated packing box Holding a board without hand protection Wearing ESD gloves Wearing an ESD strip Hold the front panel of a board with hands Instructions and Precautions for Handling Boards ...

Page 5: ...l Socket wrench Torque wrench Hex key Wire clippers Wire stripper RJ45 crimping tool Diagonal pliers Cold press pliers Needle nose pliers Combination pliers Bayonet wrench Utility knife Claw hammer Hammer drill Marker Ladder Electric iron Antistatic gloves Heat gun Multimeter ESD gloves Binding strap Insulation tape ESD wrist strap Impact tool File Vacuum cleaner ...

Page 6: ...t Input power port Ethernet service port Electric NM COM port The external clock port external time port and outdoor cabinet monitoring port share one physical port Ethernet service port Optical NOTE ODU power switch External clock port External time port Outdoor cabinet monitoring port ...

Page 7: ... OMB Cabinet Front View of the OMB Cabinet a Left View of the OMB Cabinet b Right View of the OMB Cabinet c Technical Specifications Dimensions mm 600 H x 240 W x 430 D Ambient temperature no sunshine radiation 20 C to 50 C ...

Page 8: ...t AC Power Supply Internal Structure of the OMB Cabinet DC Power Supply HEUA OMB cabinet AC power supply Fan assembly external circulating AC DC power supply facility PMU module Fan assembly internal circulating HEUA OMB cabinet DC power supply Fan assembly external circulating DCDU 03B Cable trough AC surge protection box ...

Page 9: ...abinets 1Installation Scenarios of the OMB Cabinet Dimensions of the OMB Cabinet a Recommended Requirements of the OMB Cabinet b Minimum Requirements of the OMB Cabinet c 200 mm 150 m m 600 mm 500 mm 200 mm 300 mm 800 mm 600 mm 600 mm ...

Page 10: ...in winter It is recommended that you use the APM30H or TMC11H cabinet that is configured with a heater 2Installing the OMB Cabinet Installing the OMB Cabinet on a Wall a 210mm 378mm 210mm 378mm Determine the position of the backplane on the wall and mark the four anchor points by using a marker Drill the holes and install the expansion bolt assembly 55 60mm 90 φ14 3 4 5 6 20 30mm Bolt M10x75 Sprin...

Page 11: ...wall Install the OMB frame on the backplane Installing the OMB Cabinet on a Pole b Install the first upper fastener assembly on the pole Flat washer Spring washer M10x180 bolt Install the lower fastener assembly on the backplane M10x40 bolt M6 screw ...

Page 12: ...10 Install the backplane on the pole Install the mounting brackets for the OMB frame Install the OMB frame on the backplane ...

Page 13: ...11 Outdoor Pole Mounting Scenario 1Dedicated Outdoor Installation Installing the RTN 910A in the OMB Cabinet AC Power Supply a Installing the RTN 910A in the OMB Cabinet DC Power Supply b ...

Page 14: ...ed on the left side of the surge protection box SLPU Fan assembly 2 Installing the SLPU The SLPU must be installed on the right side of the RTN 910A Ground terminal When installing the RTN 910A ensure that the fan assembly is installed in the lower part of the cabinet CAUTION CAUTION ...

Page 15: ... AC powered OMB cabinet The ground cables and signal cables must be bound separately or must be separated from each other for certain spacing to minimize mutual interference The PGND cables are in yellow green color The general ground cable has a cross sectional area of 16 mm2 Installing the PGND Cables for the RTN 910A b Ground bar NOTE Installing and Routing the Cables ...

Page 16: ...1 1 NOTE 2Installing and Routing the Power Cables AC Power Supply For AC OMB cabinets of Ver C connect the two power cables from RTN 910A to any two power output terminals such as terminals LOAD6 and LOAD7 with the maximum output current of 30 A For information about assembling the easy power receptacle pressfit type connector see Appendixes ...

Page 17: ...ing and Routing the Power Cables DC Power Supply NOTE For AC OMB cabinets of Ver C connect the two power cables from RTN 910A to any two power output terminals such as terminals LOAD6 and LOAD7 with the maximum output current of 30 A For information about assembling the easy power receptacle pressfit type connector see Appendixes ...

Page 18: ...he Service Cables for the Equipment AC Power Supply Installing E1 Cables a Installing Ethernet Cables b FE0 OUTSIDE UFLP INSIDE FE1 FE0 FE1 Rubber block FE0 OUTSIDE UFLP INSIDE FE1 FE0 FE1 Rubber block E1 cables for 1xAnea 96 4xDB25 conversion are used ...

Page 19: ...17 Installing IF Cables c Installing Fibers d Rubber block Insulation tube Binding strap ...

Page 20: ...tor CLK TOD MON of the Network Port to the Cable on the RTN 910A Pin 1 TX White Orange Pin 6 RX White Orange Pin 2 TX Orange Pin 3 RX Orange Pin 4 RX Blue Pin 8 TX Blue Pin 5 RX White Blue Pin 7 TX White Blue Pin 8 GND Brown Pin 5 GND Brown Pin 3 6 7 No connected Pin 1 2 4 No connected STAT PROG SYNC SRV LINK1 ACT1 LINK2 ACT2 CF RCV CSHD RST NMS COM EXT CLK TOD1 F1 S1 ALMI ALMO TEL MON TOD2 FE1 FE...

Page 21: ...bles a For the details on how to route service cables see Installing the Service Cables for the Equipment AC Power Supply E1 cable transit cable E1 cable lead out cable Ethernet cable transit cable Ethernet cable lead out cable IF cable Monitoring cable Fiber FE0 OUTSIDE UFLP INSIDE FE1 FE0 FE1 4 2 5 1 3 6 7 NOTE ...

Page 22: ...nting mode the cabinet is installed securely and does not swing when you shake it 5 The waterproof cover of the bottom port and the hang chains are bound with the surrounding cables 6 The surface of the overall equipment is clean and tidy The exterior paint is intact 7 The door and lock of the cabinet are proper 8 All labels tags and nameplates are correct legible and complete No What to Check For...

Page 23: ...The lugs at both ends of the power cable or PGND cable are soldered or crimped securely 5 Bare wires and lug handles at the wiring terminals are wrapped tightly by using insulation tapes or heat shrink tubes 6 The flat washers and spring washers are mounted securely to all the wiring terminals 7 The connectors of all cables are securely linked especially those at the bottom of the cabinet 8 The ca...

Page 24: ...binet Right cable hole IF cable Ethernet cable and E1 cable Right cable hole Optical fiber Left cable hole Select any one Select any one Select any one For cabinets of Ver C the number of cable holes is increased from 7 to 15 Select cable outlets based on requirements For cabinets of Ver C the number of cable holes is increased from 4 to 6 Select cable outlets based on requirements For cabinets of...

Page 25: ...ugh the corresponding cable hole on the cable module and ensure that the cable connector is idle After routing all the cables through the cable hole on the waterproof cable module connect the cable connector to the corresponding port on the equipment For information about the position of the cable holes cable routes and installation methods see the description of the installation procedure NOTE ...

Page 26: ...HUAWEI TECHNOLOGIES CO LTD Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China www huawei com ...

Reviews: